Newtown to city monitoring and evaluation report 2024

This report provides a summary of monitoring and evaluation data for the first twelve months of the Newtown to city street changes. 

Final Traffic Resolution TR173-22: Newtown to city bus and bike lanes

This is the final traffic resolution following amendments made at the 15 September 2022 Regulatory Processes Committee, and details the road and parking changes required.

Traffic resolution 173-22 for consultation: Newtown to city bus and bike improvements

This traffic resolution details the road and parking changes required that was proposed for feedback through public consulation.

Plans for Newtown to city (road markings plan)

View the full set of plans for this route.

Newtown to city signage plan

This plan shows the proposed location of signage across the area

Multi-criteria analysis (MCA) report

You can read about the options that were considered and why we progressed one option into design. Note this report includes the Botanic Garden ki Paekākā to city route as well.

Multi-criteria analysis (MCA)

This spreadsheet includes all the options considered and how they scored against the criteria. Note this report includes the Botanic Garden ki Paekākā to city route as well.

Accessibility Audit - Newtown to city

This is an independent audit of the designs for bus and bike changes between Newtown and the city from an accessibility perspective.

Bus stop bypass accessibility assessment

This is an independent assessment of the bus stop bypasses from an accessibility perspective.

Consultation summary report

This documents is an overview of community feedback received during the consultation period 11 to 31 August 2022.

Intersection analysis - pre-change report

This report outlines analysis of the Riddiford Street, Adelaide Road and John Street. It is a baseline study that can be compared to if changes are installed in future.

Parking analysis recommendations

This parking management plan covers parking data and makes recommendations for the management of parking in the area.

A survey of parking demand on the side streets was done for this project however the recommended approach for how this could be managed relies on longer-term changes being made to parking regulations under the Council’s Parking Policy.

Road Safety Audit - 30% Design

Road Safety Audit - 90% Design

Safety in design meeting minutes - Elizabeth St intersection

Wellington Central Fire Station cycleway behaviour study

This report outlines the behaviour of road users over a two week period outside the Wellington Central Fire Station after the installation of a two-way bike lane.

Safety in design meeting minutes - Vivian Street intersection