Stage 2: Greta Point to Cobham Drive

Final plans for construction

These detailed design plans show how the section of Evans Bay Parade from Greta Point to Cobham Drive will change. They include changes that were made to the draft plans in response to community feedback following consultation in 2021. 

Amended - Concept Designs

Amended - Parking management plan

Amended - Supplementary design report

Amended - Traffic resolution report

Stage 2: Greta Point to Cobham Drive 2021 consultation

Draft plans for consultation

Draft plans for the proposed designs between Greta Point and Cobham Drive. This document was amended following consultation.

Draft Supplementary Design Report: Greta Point to Cobham Drive for consultation

This report outlines the wide range of considerations and options explored when developing the proposed designs for stage 2. The report supplements the stage 1 reports. This document was amended following consultation.

Traffic resolution report for consultation

The traffic resolution (TR121-21) includes a legal description of the proposed changes. This document was amended following consultation.

Parking Management Plan for consultation

This report details the proposed parking changes between Greta Point and Cobham Drive. This document was amended following consultation.

Consultation report 2021

This is a summary of the feedback received during consultation on the concept design for the section of Evans Bay Parade between Cobham Drive and Greta Point (14 September to 14 October 2021).

Stage 1: Oriental Bay to Greta Point

Evans Bay plans - Weka Bay to Little Karaka Bay

These plans show the changes for the section between Weka Bay and Little Karaka Bay (work started in 2023). 

Issues paper

The Council commissioned this report in 2016 to investigate improvement options for cycling along Evans Bay Parade from Cobham Drive to Oriental Bay.

Evans Bay section 1 plans

View the construction plans for the section between Oriental Parade (at the Carlton Gore Road intersection) and Greta Point.

Design report part 1

Evans Bay Design Report (part 1) - this provides information about the community working group process, options considered, and the multi-criteria assessment.

Design report part 2

Evans Bay Design Report (part 2) - this provides information about the community working group process, options considered, and the multi-criteria assessment.

Traffic Resolution: Section 1

This document describes in detail proposed changes to Evans Bay, between Carlton Gore Road and Greta Point.

Evans Bay concept designs

View concepts of both options at various places along Evans Bay.

Evans Bay Section 1 Traffic Resolution consultation

Evans Bay 2016 community engagement

See a summary of feedback from the first community engagement in 2016.

 

Evans Bay Feedback summary 2016